GTC Ingeniería: engineering, construction and asset management for the energy sector in Colombia. We are ready.

New EnergyNew ChallengesOur Capability

A New Eraof Energy.

Latin America has entered a new era of energy. The challenge is no longer about accessing resources. It is about developing the capability to deliver them safely, efficiently and responsibly.

ConnectingWhat Matters.

Infrastructure only performs when everything around it performs. We connect people, engineering, technology and operations to enable reliable, productive assets.

Digital by Design.

We are an Infrastructure Readiness Partner. We help operators move from vision to execution with confidence.

GTC video: We are ready.

What wehave built.

  • Storage tank and pipelines on supports at a transportation infrastructure station.

    MA-0029396

    Transportation infrastructure.

    Civil, mechanical, electrical and instrumentation works for transportation infrastructure.

  • Aerial view of a tanker moored next to an offshore platform at the Cartagena Refinery.

    MA-0029396 – OT No. 03 GTC-003-PLR

    TNP and TMR offshore platforms.

    Structural reinforcement of the platforms and rehabilitation and paving of roads at the Cartagena Refinery.

  • Worker next to reactor R-2653 during its crane installation at a process plant.

    3014056

    R-2653 reactor installation.

    Civil works for the installation of process infrastructure.

  • Crane lifting a tank for a wastewater treatment system.

    3019000

    Industrial sanitary systems.

    Engineering, construction and commissioning of wastewater treatment systems.

  • Excavators digging a pipeline trench at a work site.

    3019421

    Multidisciplinary infrastructure.

    Civil, electrical, mechanical and instrumentation construction works.

  • GTC technicians servicing a valve system under a canopy.

    8000005279

    Infrastructure maintenance.

    Maintenance of non-industrial facilities across three operating areas.

  • Pipeline on supports with an injection wellhead valve at an oil field.

    3045349-001-O

    Surface facilities.

    Construction of infrastructure for pressure maintenance and injection wells.

  • Insulated pipes and support structures under construction, with scaffolding, on Trunk Line 5.

    3045349-002-AO

    Facilities – Trunk Line 5.

    Construction of surface facilities for Trunk Line 5, Section 3 flowlines.

  • Cranes lifting a pipe section for interconnection lines.

    3045349-003-OQ

    Interconnection lines.

    Construction of mechanical lines and horizontal directional drilling (HDD).

  • Pressure vessels and steel piping at a Cartagena Refinery unit.

    8607112 ODS 1

    Civil works – Cartagena Refinery.

    Civil works for the Cartagena Refinery initiatives.

  • Walkway between valves and pipes at an injection PAD.

    3045349-004-AO

    Constructability – Caño Sur Este.

    Technical support for the construction planning of the injection PAD project.

  • Drilling rig and equipment at an injection PAD of the Caño Sur Este project.

    3045349-005-AO

    Injection PAD infrastructure.

    Construction of infrastructure for the Caño Sur Este project, Module 4.

  • Aerial view of an oil well site under construction surrounded by pastures, with its pipeline trunk line.

    3045349-006-AO

    Trunk line constructability.

    Technical support for the development of Trunk Line 4, Cumanday and its branches.

  • Parallel pipeline trunk lines on supports along a dirt road.

    3045349-007-AO

    Cumanday and Trunk Line 4.

    Civil, electrical, mechanical and instrumentation works for the Cumanday and Trunk Line 4 trunk lines and their branches.

  • Workshop building under construction, with steel structure, aerial work platforms and workers.

    3045349-008-REF

    Workshop modernization.

    Construction of blocks C and D for the modernization of the maintenance workshops and the heat exchanger washing yard.

  • Injection trunk lines winding on supports across the savanna.

    3045349-010-OR

    PAD 3 and injection trunk lines.

    Civil, mechanical, electrical and instrumentation infrastructure construction for CSE M4.

Turningchallenges into achievements.

  • Ecopetrol Group glass trophy: Iconic Supplier with Inclusive and SosteCnible Energy recognition 2022, Innovation and Technology category.

    2022: Iconic Supplier.

    with Inclusive and SosteCnible Energy – Ecopetrol

  • Gold star trophy of the Ecopetrol Iconic Supplier with Inclusive and SosteCnible Energy 360° recognition, 2023.

    2023: Iconic Supplier.

    with Inclusive and SosteCnible Energy 360° 2023 – Ecopetrol

  • Campetrol Award trophy with the Sustainable Development Goals wheel and a winner plaque.

    2023: Campetrol Award.

    “Governance” category

  • Gold star trophy of the Iconic Supplier with Inclusive and SosteCnible Energy 360° 2024: overall award, first place among large companies.

    2024: Iconic Supplier.

    with Inclusive and SosteCnible Energy 360° 2024 – Ecopetrol

The new energy generation projects will demandnew capabilities.Not someday.Not eventually.

Today.